MT Bungalow supports railway works in the Lyon region with a turnkey labour camp accommodation
- Client: SNCF Réseau
- Sector: Railway works / Civil engineering
- Date: Q1 2024
- Surface installée : 72 m² – 6 modules modulaires
- Location: Lyon (69), Auvergne-Rhône-Alpes
As part of the program to modernise high-traffic regional lines,, SNCF Réseau has undertaken a series of priority constructions in the Auvergne-Rhône-Alpes region. To effectively support its intervention teams, a temporary labour camp accommodation was rolled out in the heart of the Lyon metropolitan area, in the immediate vicinity of the platforms.The solution implemented by MT Bungalow is based on a set of 6 prefab containers, totalling 72 m², divided between espaces sanitaires, vestiaires, bureaux et moduleDelivered ready to install, these modules were installed in one day, in a dense urban environment and under significant logistical constraints.This project had multiple challenges:
- Minimising installation time to limit on-site interruptions
- Ensuring full compliance with the PMR, RT construction site and electrical safety standards
- Guaranteeing the comfort and autonomy of operators, with hot water, ventilation and integrated furniture
- Adapting the configuration to the technical specificities of the railway terrain
This project illustrates MT Bungalow's ability to provide tailor-made, robust and immediately operational solutions,even in demanding technical contexts.
Project criteria:
- A functional space for 12 people
- Of the toilet blocks and individual changing rooms
- We dining area with integrated kitchenette
- Turnkey delivery, in a constrained urban context
The solution proposed by MT Bungalow:
We proposed a labour camp accommodation of 6 flatpack containers, configured according to the technical requirements of the site:
- 2 changing room/shower/WC modules,with water heater and ventilation
- 2 changing office + meeting, air-conditioned with integrated furniture
- 1 dining room module equipped with a sink, a fridge and storage space
- 1 dining room machine room module, with centralised electrical panel
All the containers were delivered ready to install, connected to the local network with MT Bungalow assistance.
Project data sheet
| Element | Detail |
| Total installed area | 72 m² (6 modules of 12 m²) |
| Exposure time | 1 day (excluding connections) |
| Module types | Office, toilet blocks, cafeteria, changing room |
| Expected duration of use | 10 months |
| Standards applied | NF, RT construction site, PRM accessibility |
| Delivered as | Pre-assembled, ready to install |
PDF download possible
Client benefits
- Speed of installation : complete installation in less than 48 hours
- Optimised comfort for the teams, even in winter
- Regulatory compliance at no extra cost (electricity, PMR, ventilation)
- Controlled logistics in a dense urban area
- Reversibility of the project with possibility of transfer