Module-T supports railway works in the Lyon region with a turnkey modular base camp
- Client: SNCF Réseau
- Sector: Railway works / Civil engineering
- Date: Q1 2024
- Installed surface area: 72 m² – 6 modular modules
- Location: Lyon (69), Auvergne-Rhône-Alpes
As part of the program of modernization of high-traffic regional lines, SNCF Network has undertaken a series of priority projects in the Auvergne-Rhône-Alpes region. To effectively support its intervention teams, a temporary modular living base was deployed in the heart of the Lyon metropolitan area, in the immediate vicinity of the tracks.
The solution implemented by Module-T is based on a set of 6 prefabricated bungalows, totaling 72 m², distributed between sanitary areas, changing rooms, offices and cafeteriaDelivered ready to install, these modules were installed in one day, in a dense urban environment and under significant logistical constraints.
The challenges of this project were multiple:
- Minimize installation time to limit on-site interruptions
- Ensure a full compliance with PMR, RT construction site and electrical safety standards
- Ensure operator comfort and autonomy, with hot water, ventilation and integrated furniture
- Adapt the configuration to the technical specificities of the railway terrain
This project illustrates the ability of Module-T to provide tailor-made, robust and immediately operational solutions, even in demanding technical contexts.
Project criteria:
- A functional space for 12 people
- Of the independent toilets And individual changing rooms
- A dining area with integrated kitchenette
- Delivery turnkey, in a constrained urban context
The solution proposed by Module-T:
We proposed a modular living base of 6 pre-assembled bungalows, configured according to the technical requirements of the site:
- 2 modules changing rooms/showers/toilets, with water heater and ventilation
- 2 modules offices + meeting, air-conditioned with built-in furniture
- 1 module refectory equipped with a sink, a fridge and storage
- 1 module technical room, with centralized electrical panel
All bungalows have been delivered ready to install, connected to the local network with Module-T assistance.
Project data sheet
Element | Detail |
Total installed area | 72 m² (6 modules of 12 m²) |
Exposure time | 1 day (excluding connections) |
Type of modules | Office, restrooms, cafeteria, changing room |
Expected duration of use | 10 months |
Standards applied | NF, RT construction site, PRM accessibility |
Delivered in | Pre-assembled, ready to install |
PDF download possible
Customer benefits
- Speed of commissioning : complete installation in less than 48 hours
- Optimized comfort for teams, even in winter
- Regulatory compliance at no extra cost (electricity, PMR, ventilation)
- Controlled logistics in a dense urban area
- Reversibility of the project with possibility of transfer
Do you have a similar project?
Module-T supports you to design and install a modular base camp adapted to your land constraints. Contact our teams for a personalized quote.